Supply Of Solid Waste Incinerator
During the technical audit it was observed that MODECOR shall generate
solid waste from various sources such as impregnators, presses, and sanding
/ cutting of the boards. MODECOR needed to dispose off this solid waste
for which various options were available.
After discussion and weighing the various options it was decided to
incinerate such solid waste and recover the heat by generating steam
which is required by MODECOR for resin manufacturing plant.
LCS supplied an incinerator plant to MODECOR on turn key basis. Scope
of LCS included basic, detailed engineering, equipment supply, erection
and commissioning assistance. The supply part has already been completed
in May 2002. The project will be commissioned in November 2002.
|

(Click
to enlarge)

(Click
to enlarge) |